Environment – Friendly
The modular removable piping system & plant equipment insulation capable of using sustainably
The re-use of insulation installed once as the modular removable insulation of piping system is possible permanently in terms of RAPID
RAPID has 0% of wastes at time of several piping maintenance and inspection
High Strength + Weigh Lightening
Strength not influent on the facility deformation
The Metal jacket that the compression combining method of construction of independent AL-Profile has been applied with the light and excellent strength
Excellent durability with no deformation in the long period repetitive attachment & detachment
The reduction of load stress for the facility with the weight lightening of insulation
Precision + Insulation Performance
Exellent insulati ng effect coping with all environments
The minimization of inflow of foreign substance between gap of product parts crack and heat loss through the strict process inspection of metal cover combination
The active coping with the thermal expansion of piping by the connector technology
Increase in the insulation effect by the increase in the thermal resistance with the application of filling technology of insulation and special crack method
Aesthetic Impression
Beautiful exterior appearance connected to RAPID
Excellent durability applying PVDF (Poly Vinylidene Difluoride) coating
Conversion of industrial mood with the application of excellent painting chroma and various colors
The role of implicit communication with the application of intuitive color in accordance with the kind of piping
Technologies + Promptness
Accurate and fast installation with the cutting edge technology
The accurate design/construction with the precise actual measurement of site(spatial restriction, non-standard plumbing) utilizing
Convenient and prompt construction at time of maintaining the plumbing by assembling the modular component manufactured in advance with the simple catch clip manipulation
The more it is used, the higher the economic feasibility!
The construction cost of existing heat reserving insulation with
the maintenance of 2 times only shall be recovered